A section of the container terminal quay at Cape Town Port was raised, and then had to be modified to incorporate power cables for the gantries, as well as not pose a trip hazard for personnel working on the quay.
The brief
The electric cables that feed power to the gantries had to be hidden in a channel within the new composite panels. Concrete was considered as an option, however, to build up the 190mm area to the water side of the gantry rails would weigh approximately 1,000 tons.
The solution
Composite panels were designed, tested and then manufactured in South Africa by Aerontec. These panels had to be strong enough to withstand huge loads, be weather resistant for many years, and had to be installed in such a way as to minimize down time.
GRP composite infused glass resin panels w...
Read More